We provide various services especially electrical, instrumentation and mechanical works, in projects we manage domestically and abroad.

REFERENCE PROJECTS

TURKCELL – EUROPE DATA CENTER    

ÇORLU, TURKEY

 

 

Client:                      TURKCELL Makine

Completion:           December, 2020

Reference:              **Company reference

                                    (KLE Engineering)

Description of Work:

  • The Project located in ÇORLU - TURKEY

  • 43.000 sqm project area, 6.800 sqm w, TIER 3 Certified, LEED GOLD Green Building Certified

IMPRO-CENGİZ MAKİNE

 

Gebze,TURKEY

 

 

Client:                      IMPRO-Cengiz Makine

Completion:           May, 2018

Reference:              **Company reference

                                    (KLE Engineering)

Description of Work:

  • Project management and consultancy including design, procurement, installation, commissioning,

  • Contract management, claim management.

INTERNATIONAL TURKMENBASI SEAPORT PROJECT

 

Turkmenbasi,TURKMENISTAN

 

 

Client:                     The State Service of 

                                 Marintime & River

                                 Transportation of Turkmenistan  

Completion:           May, 2018

Reference:              *Personal references

Description of Work:

  • The project ‘Turkmenbasi Seaport’ scope is not only important for the EPC scope of below mentioned terminals,

  • Ferry and passenger terminal,

  • Container terminal,

  • General cargo port,

  • Bulk cargo port,

  • Ship building and repair facility are built,

  • Ro-Ro and polypropylene terminal is expanded,

  • But also, by the budget of  $ 1.5 billion is constructed as the biggest seaport of the Caspian Sea.

GARABOGAZ AMMONIA AND UREA PRODUCTION

 

Garabogaz,TURKMENISTAN

 

 

Client:                      Turkmenistan Ministry

                                 of Chemistry

Completion:           June, 2018

Reference:              *Personal references

Description of Work:

  • Annual production capacity of 1.155.000 tons,

  • Budget of  $ 1.35 billion,

  • The biggest ammonia & urea production plant of Turkmenistan.

0,8 mtpy NEW BAR ROLLING MILL PROJECT / LIBYA

 

 

Client:                      LISCO – LIBYAN IRON AND                                           STEEL COMPANY

Completion:           September, 2016

Reference:              *Personal references

Description of Work:

  • The project located in Misurata – LIBYA , Mainly consist of two part;

  • Reconditioning of the existing Facilities

  • Balance Erection Works of 0,8 mtpy New Bar Rolling Mill Facility ( Mechanical , Electrical & Instrumentation Erection Works & Piping including Cold Tests and Commissionig assistance Works.)

CONSTRUCTION OF CONTAINER TERMINAL PROJECT / LIBYA

Client:                     Misurata Free Zone                                                          Administration

Completion:           May, 2014

Reference:              *Personal references

Description of Work:

  • Construction of berths for the berthing up to 81.000 DWT Container Vessels.

  • The Deck Structure; steel pipe pile foundadtions supporting a combined precast and in-situ concrete  structure.

  • The total length of the berth is : 800 mt.

  • The Works performed for the construction of the berths as follows :

  • Fabrication of two Jack-up barges  ( 400 ton capacity each ) including detailed design.

  • Construction of 589 mt. Long berths with 696 pcs of piles, each 48 ‘’  diameter with 20 mm thickness and min 36 mt. in length , supporting a combined precast and in-situ concrete deck structure.

  • Extention of 211 mt. Long existing berths with 102 pcs of piles on the sea side each 48 ‘’ diameter with 20 mm thickness and min. 36 mt. in length süpporting a combined precast and inüsitu concrete deck structure and 54 pcs of bored piles on the Land side each 1.000 mm diameter and 15 mt. in length supporting SSG Crane Beams.

  • Supplying and Installation of rubber fenders.

  •  Applying Catodic Protection to all exposed ferrous members includ. Steel Piles

  •  Supplying and Installation of Crane Rails

BISKRA 230 MW SCPP PROJECT   

ALGERIA

 

 

Client:                      SONELGAZ – ALGERIA                                                   SONELGAZ(National Society for                                   Electricity and Gas ) - ALGERIA   

Completion:           June, 2017

Reference:              *Personal references

Description of Work:

  • Complete Electrical, Mechanical and Instrumentation Installation Works of 230 MW Gas Turbine PP

1450 MW MOSTAGANEM PP COOLING WATER INTAKE SYSTEM / ALGERIA

 

Client:                      SONELGAZ - ALGERIA

Completion:           In progress

Reference:              *Personal references

Description of Work:

  • The Scope of Project is installation of Cooling Water Intake Pipeline

  • ( 5 ea x 2000 mt. , HDPE Pipes with 2500 mm diameter ) including precast concrete intake head structures as well as discharge unit for 1450 MW Combined Cycle Power Plant Project at MOSTAGANEM - ALGERIA

BAKU SHIPYARD PROJECT / AZERBAIJAN 

 

 

Client:                     BAKU SHIPYARD LLC

Completion:           September, 2013

Reference:              *Personal references

Description of Work:

  • Construction of 4 building in Baku Shipyard Project

  • Total Area is : 44.000 m2 . Two Steel Structure Building ( 28.200 m2 ) and three reinforced concrete building ( 15.800 m2 )

  • The Total Weight of Fabricated and Installed Steel Structure is : 6.500 Ton includ. Detailed Design and Shop drawings.

KARBELA 300 MW POWER PLANT

IRAQ 

 

Client:                      Ministry of Electricity - IRAQ

Completion:           Junei 2012

Reference:              *Personal references

Description of Work:

  • Turnkey Construction of 300 MW Diesel Power Plant Including all Civil, Mechanical, Electrical & Infrastructural Works.

DIWANIYAH 200 MW POWER PLANT

IRAQ

Client:                      Ministry of Electricity - IRAQ

Completion:           July, 2012

Reference:              *Personal references

Description of Work:

  • Turnkey Construction of 200 MW Diesel Power Plant including all Civil , Mechanical , Electrial & Infrastructural Works.

VLORE 1x100 MW CCPP

Vlore,ALBANIA

 

Client:                      KESH Albanian Power 

                                 Corporation              

Completion:           September, 2009

Reference:              *Personal references

Description of Work:

  • Complete Mechanical Erection , Piping, Insulation and Painting Works of 100 MW  Single-Shaft  Combined

  • Cycle Power Plant.

  • Gas Turbine, Steam Turbine, Generator and auxiliaries (Supplied by Ansaldo-Italy)

  • HRSG (Supplied by Nooter Ericsen – Italy)

  • Condenser (Supplied by Ofmeco– Italy)

  • Piping and Supports (Fabrication, Erection, PWHT, NDT, Painting ,Insulation, Testing)

  • BOP Equipments and Systems i.e. Water Treatment Plant, Sea Water Pumps, Fuel Oil Storage, etc

  • 4300 m. API 5L Fuel Oil Piping for Offshore connection between CBMS and Site (Welding and NDE testing) 

SUMGAIT 500 MW CCPP

 

Sumgait,AZERBAIJAN

 

 

Client:                      AZENERJI JSC.

Completion:           May, 2007

Reference:              *Personal references

Description of Work:

  • Manufacturing and assembly of two heat recovery steam generators (including design and supply)

AKENERJI CCPP

 

İzmir,TURKEY

 

 

Client:                      AKENERJI

Completion:           December, 2004

Reference:              *Personal references

Description of Work:

  • Complete Mechanical and Instrument Erection Works of 2 Heat Recovery Steam Generators and associated equipment

  • 32 Tons piping including supports and valves

  • Instrument Installation

  • Supply and installation of Insulation

  • NDT, PWHT services

KARADAKH GCSB

 

Karabakh,AZERBAIJAN

 

 

Client:                      AZERGAZ A.Ş

Completion:           August, 2003

Reference:              *Personal references

Description of Work:

  • Complete Mechanical / Electrical / Control & Instrumentation Erection Works of Gas Compressor Station also including

  • Supply of all structural steelwork for compressor building and pipe racks

  • Design, supply and fabrication of fire works storage tank

  • Supply and fabrication of vent stack

SEVERNAYA 400 MW

COMBINED CYCLE POWER PLANT

 

Severnaya,AZERBAIJAN

 

 

Client:                      Joint Stock Company AZENERJI

Completion:           November, 2002

Reference:              *Personal references

Description of Work:

  • Complete mechanical, electrical control and instrumentation erection works of 400 MV single-shaft.

  • Combined cycle pover plant (including structural steel works of GB building, pumphouse and underground.

  • CW pipeline.

ESKISEHIR INDUSTRIAL

POWER CCPP

 

Eskisehir,TURKEY

 

 

Client:                      Eskisehir Industrial Power     

                                 Generation Autoproductor

                                 Group Co.

Completion:           April, 2001

Reference:              *Personal references

Description of Work:

  • Complete electrical and instrumentation installation works of  main compressor ststion and booster compressor station.

TUPRAS CCR &

ISOMETRIZATION PLANT PROJECT

 

Aliaga,İzmir,TURKEY

 

 

Client:                      TUPRAS, Turkish Petroleum     

                                 Refineries Corp.

                                 İzmir Refinery

Completion:           September, 2000

Reference:              *Personal references

Description of Work:

  • CCR & Isometrization plant project, spool fabrication and erection works of underground and aboveground pipe lines including;

  • 645 tons ON site aboveground piping erection,

  • 285 tons  OFF site avoveground piping erection,

  • 215 tons ON site aunderground piping fabrication and erection,

  • 11 tons  pipe support fabrication and erection.

TOMSKNEFT GCS
Leuginetskoye, Western Siberia, RUSSIA

 

 

Client:                      OAO TOMSKNEFT VNC       

Completion:           November, 1998

Reference:              *Personal references

Description of Work:

  • Complete Electrical and Instrumentation Installation Works of Main Compressor Station and Booster Compressor Station including;

  • 6 no.  Power Transformers and Diesel Generators.

  • 134 no.  MV,LV Switchgears and MCC’s and HT panels.

  • 1315 no.  Lighting Fixtures including Poles, Supports and Accessories.

  • 262 km. Power & Control and Instrument Cables including Terminations.

  • 22 km. Heat Tracing Cables and complete HT Systems.

  • 25 km. Cable Ladders, Trays and Conduits.

  • 3120 no.  Field Instruments including Calibration and Loop Checks.

  • 8 km. Instrument Impulse Piping & 30 no. Instrument Panels (DCS & ESD Systems).

  • UPS, Power Metering and Monitoring Systems, Complete Lightning Protection & Grounding Systems.

  • Fire & Gas Detection Systems, Telephone & Communication Systems.

ÇAYELİ COPPER WORKS INC.

PASTEFILL PLANT 

Rize, TURKEY

 

 

Client:                      Çayeli Copper Works Inc.

Completion:           March, 1999

Reference:              *Personal references

Description of Work:

  • Civil Construction and Mechanical , Electrical and Instrumentation Erection Works of Paste fill Plant including;

  • Complete Civil Works.

  • Supply, Fabrication and Erection of a Three Storied Steel Building.

  • Supply, Fabrication and Erection of an Elevated Steel Thickener Tank  and an Agitated Storage tank.

  • Mechanical Erection of all Plant Equipment.

  • Supply and Erection of Victaulic Grooved Piping and Utility Piping Systems.

  • Supply of Power & Control and Instrument Cables, complete Plant Instruments, Lighting Fixtures.

  • Complete Electrical and Instrumentation Erection Works.

  • Modification Works to existing Thickeners and Tailings Disposal System.

NUH CIMENTO COMBINED CYCLE POWER PLANT

Hereke, TURKEY

 

 

Client:                      Nuh Çimento A.Ş.

Completion:           October, 1999

Reference:              *Personal references

Description of Work:

  • Complete Mechanical, Electrical & Instrumentation Works of one HRSG for LM 2500+ type Gas Turbine and all External Piping Work including;

  • HRSG contains about 285 tons of Pressure Part and 253 tons of Non-Pressure Part.

  • External Piping total weight (alloy, SS and CS) is about 27 tons.

  •  Pipe Rack and Pipe Support weight is about 25 tons.

  • Heaviest Single Piece in this project was the Heating Module (140 tons) which was handled by one 440 t. and one 330 t. Hydraulic Mobile Cranes together.

  • Complete Electrical and Instrumentation Installations.

EEE GAS TURBINE POWER PLANT 1x40 MW

Eskişehir, TURKEY

 

 

Client:                      Eskisehir Industrial Power                                             Generation Auto Production                                           Group Co.

Completion:           April, 1998

Reference:              *Personal references

Description of Work:

  • Complete Mechanical, Electrical & Instrumentation Installation Works of a Frame 6 type Gas Turbine Power Plant (The first stage of the Combined Cycle Power Plant) including;

  • 328 tons Mechanical and Electrical Equipment.

  • 10 tons Piping.

  •  3 tons Power & Control Cables.

  •  Complete NDT Services.

TENGIZCHEVROIL KTL 2.3 EXPANSION PROJECT PIPE SPOOLS FABRICATION

İstanbul, TURKEY

 

 

Client:                      Tengizchevroil

Completion:           November, 1998

Reference:              *Personal references

Description of Work:

  • Fabrication of Pipe Spools for the Interconnecting Piping System of 4 no.’s  ..of.FM type Utility B Boilers and Pipe Connections to Water Deminerilazition ..Plant   including; ..

  • 80 tons Pipe Spools ( Pipe diameters.range from 2” to 14”).

  •  Complete NDT Services.

  •  Painting of Pipe Spools.